Testimonials
Reviews of Our Pre-Commissioning & Predictive Maintenance in Manufacturing Services
The Aquamilling and Steam blows are BW’s core competencies, the systems had such a high level of cleanliness that the targeted steam blows could be completed within less of a day per target location, both Aquamilling and Steam Blows were completed in less than a month – an extraordinary result for predictive maintenance in manufacturing.”
Fortune 100 Chemical Company
ManagerBlue Wolf is one of the top contractors we have ever worked with in terms of excellence of service and value, which is why we formally recognized their efforts as a top contractor this year for our power projects.
International EPC
Power Station ManagerBlue Wolf has been very professional from the very first phone conversation through project completion. They spent a good deal of time answering my questions and explaining their process without ever pressuring me into purchasing services I did not require. They arrived fully prepared and performed their service with minimal disruption. I will not hesitate to use Blue Wolf again in the future.
Power Generation Company
Project ManagerBlue Wolf has become my “go-to” contractor in regards to industrial chemical cleaning and lube oil flushing. Throughout many projects, Blue Wolf provided the proper equipment and skilled safe labor to fully execute the scope of work to our client’s specific expectations. Not only did Blue Wolf achieve the final goals set, but also maintained, in-depth, proper communication throughout the process. I would not hesitate to recommend Blue Wolf to anyone in need of a chemical cleaning, predictive maintenance companies, or lube oil flushing contractor.
Regional Engineering Firm
Project ManagerI have found working with Blue Wolf very professional. They have helped us set up systems to recycle our power steering fluid. They fill the void if I do not have the manning to ensure the job gets done. They have made a wonderful recommendation to our company to ensure the system flow goes smoothly. They call in advance or contact those members prior to arriving so that items are prepared and completed very timely
Global Auto Parts Manufacturer
Engineering ManagerBW saved us millions after reducing the cleaning activities down from four months to five weeks. They provided a major impact on the critical path startup timeline that could have otherwise been disastrous. Thanks again ESI!
International EPC
ManagerI want to take a few moments to give thanks to you and your team for supporting the plugged reactor job here at Chevron Phillips Chemical. Your predictive maintenance companies team was on site and ready to go to work very prompt. Your teams are very professional and very knowledgeable of the duties that they perform. Again thank you for your wonderful service and great job!
Refining Company
Project ManagerBlue Wolf’s pre-engineering and steam blow plant preventive maintenance services were key for the startup of our new coal-fired boilers. The pre-engineering and detailed procedures submitted prior to the actual work ensured that the multi-million pound-per-hour steam blows were successfully completed in ten days instead of the months it would have taken going the conventional route.
International Chemical Plant
Engineering ManagerI greatly appreciate the work they accomplished on my job site. They were on time, professional, diligent, and most of all, effective.
National Contractor
Job ContractorI wanted to thank your technicians who were on time and up to speed on the work that needed to be done. After cleaning the tanks they left the area around the job cleaner than when they arrived. I have, in the past, used your services for tank cleaning and I will continue to in the future. The side stream filtering you did on one of our gearboxes did a very good job of cleaning the lubricant.
Global Tire Manufacturer
Plant ManagerI have worked with Blue Wolf on numerous occasions in the refinery. Each job has been a major machinery oil system cleanup.The employees that I worked with in the refinery are self-motivated and easy to work with. They are quick to respond and provide input based on experience where applicable. BW has the equipment necessary to complete oil system cleanups with little or no assistance from Refinery Maintenance.
I will continue to recommend them for future oil system clean jobs and I look forward to working with BW in the future.
Global Refinery
Maintenance ManagerI have found working with Blue Wolf to be very professional. We have worked together to develop a hydraulic oil recycling program that will continue to benefit us for years to come. They are responsive to our needs and have worked within our company framework both making and taking suggestions to improve our shared process of recycling our hydraulic oil. I would recommend BWPS to anyone trying to develop a fluid reconditioning process for predictive maintenance in manufacturing.
Global Rubber Manufacturer
PMMy experience with them was very positive. The job is now complete and I believe they finished prior to the expected end date. Most importantly, they finished with no safety issues or injuries. Our equipment they cleaned is on target for our expectations. My overall assessment of Blue Wolf is very good. I would indeed invite Aquadrill for future needs in the Gemini Unit.
International Chemicals Company
Lead EngineerThe Blue Wolf team have made the power generation equipment start-up process more efficient, substantially reducing the critical path worries on our tight timelines. Their approach is to help our customers pre-plan for the upcoming activities in order to minimize delays and keep the project on schedule.
Global EPC Contractor
Project ManagerThis was my first outage working with Blue Wolf Performance Solutions and I found them to be professional, prompt, hardworking and knowledgeable. I really appreciate the hard work and speed to which they completed the cleaning of our lube oil tanks. I look forward to working with them in the near future on other plant preventive maintenance.
Regional Power Generation Company
Project ManagerRecently, we completed a job in the Midwest, which called for the replacement of several bulk tanks and associated piping at a large compressor station. The tanks held lube oil and coolant for several big engines, each of which has capital cost in the tens of millions. We called BW to pickle and oil them, cleaning them before commissioning. Everyone had a lot on the line.
The client contact had a liquidated damages clause, so time was of the essence. BW mobilized equipment from three states, arrived on the day agreed, hooked up, worked day and night, and were finished before the time agreed. They charged exactly the price they quoted us a month before the job. Their technical and lab protocols fully documented the work and we got a clean approval from the client. We could not be happier. This was the fourth time we have used Blue Wolf as our subcontractor on this type of work and I recommend them without reservation as a top predictive maintenance companies.
National Engineering Firm
Project ManagerLooking over a long history of BW’s service to our company, I want to thank you for the many jobs well done! In an era of uncertainty, it is reassuring the have the certainty that of reliability, professionalism, and the commitment to excellence of service.