Abengoa – Fulcrum Sierra Biofuels Plant

Reno, Nevada

Blue Wolf was contracted in Q1 2020 to provide engineering and execution of hydrotesting and High Velocity Oil Flushing (HVOF) of six hydraulic systems during pre-commissioning of the facility. Testing included pressures up to 7500 PSI of all installed piping followed by HVOF to meet OEM cleanliness specifications.