Entergy Waterford – Condenser Tube Cleaning

For over 12 years Blue Wolf has performed annual condenser tube cleaning for Wateford 3 (WF3).  Project scope includes opening and closing of all manways and hatches, hydrolazing or projectile tube cleaning, followed by helium leak detection services to verify tube performance conditions are within customer limits.  In the event leaking tubes are discovered, Blue Wolf performs mechanical tube plugging.

NextEra – Embedded Technician HEX & Condenser Cleaning

For over 5 years Blue Wolf is proud to be the single source provider for NextEra for condenser and heat exchanger cleaning at all NextEra Nuclear facilities.  The work encompasses providing automated tooling to perform hydrolazing at each of these facilities.  Blue Wolf has performed the work during this period without a single OSHA incident.

Southern Company – Unit 4 Annual JBR Outage

Blue Wolf performed JRB scrubber cleaning at Plant Bowen to removal scale buildup from approximately 4,700 tubes, each 6”x17’ made of PVC.  Blue Wolf is the only company that has successfully performed tube cleaning without tube erosion-as a result of proprietary cleaning equipment designed in conjunction with Southern Company. The work activities also include hydroblasting and vacuuming the sump of the JBR scrubbers.

Abengoa – Fulcrum Sierra Biofuels Plant

Blue Wolf was contracted in Q1 2020 to provide engineering and execution of hydrotesting and High Velocity Oil Flushing (HVOF) of six hydraulic systems during pre-commissioning of the facility. Testing included pressures up to 7500 PSI of all installed piping followed by HVOF to meet OEM cleanliness specifications.